| Ref | Address | Description | Received | Status |
|---|---|---|---|---|
| WEB1564/24 | 425, North Circular Road, Dublin 7 | The development will consist of Demolition/removal of existing single storey dining room and single storey shed at rear and construction of: 1no. Two-bedroom Apartment within a two-storey unit, associated communal and private areas, boundary treatments and all associated civil/site development works. | 2024-05-08 | APPLICATION DECLARED INVA |
| 3648/24 | DCU All Hallows College, Grace Park Road, Drumcondra, Dublin 9 | PROTECTED STRUCTURE The development will consist of the installation of a new estate fence within All Hallows campus grounds and renovation of the boundary wall, extending from campus vehicular entrance on Church Avenue to southern-most vehicular entrance on Grace Park Road. Existing estate fence to east planted area to be replaced with new estate railing completed with wire mesh. Additionally, the gate pillars at both entrances will be refurbished. All Hallows Campus is the historical demesne of Drumcondra House, a Protected Structure (RPS Ref 3237). The new 1.55metre high estate style fence will run along southern edge of existing southern lawn within the historic All Hallows Campus. Renovation works to the existing boundary wall involve; installation of ground anchor retaining structures at 1.2metre centres along Church Avenue where required; removal of modern cement pointing and masonry blockwork; repointing with lime-based mortar; rebuilding areas where modern masonry block has been removed, using coursed random rubble stone; rebuilding sections of the top of the boundary wall that have collapsed, also using coursed random rubble stone. | 2024-05-08 | Granted |
| WEB1563/24 | 5, Kincora Drive, Clontarf, Dublin 3, D03 RW99 | The development consists of the construction of a single storey extension to the rear of the existing house and for a new window to the ground floor side elevation and for all associated site works. | 2024-05-08 | Granted |
| WEB1567/24 | 10, Prospect Road, Glasnevin, Dublin 9 | The development consists of a two storey mews, 82 sq m floor area and brick faced. The mews includes entrance hall, stairs, kitchen/dining/living room, utility space and WC at ground floor and 2 bedrooms, one with en-suite shower-room and bathroom at first floor. The mews has an entrance courtyard at ground level and a balcony at first floor facing the lane, which is off Lindsay Road. And also private open space between the mews and main house. Mews includes a ground floor passage giving bicycle and pedestrian access to rear garden of main house and that of mews. | 2024-05-08 | GRANT PERMISSION |
| WEB1569/24 | 272, Clontarf Road, Clontarf, Dublin 3, D03 K0V3 | Dublin City Council, Planning Permission is sought for works to 272 Clontarf Road, Clontarf, Dublin 3, D03 K0V3 for Margaret & Garrett Scanlan. Works to include construction of 2 no. skylights to front roof plane of existing dwelling and construction of dormer to rear roof plane, along with internal alterations. All along with associated landscaping and site works. | 2024-05-08 | Granted |
| WEB1562/24 | 69, Mespil Road, Dublin 4 | a) Change of use from existing commercial office use to residential use comprising 191.6m2 b) Provision of 3nr. self-contained apartments c) Provision of new, two-storey extension to the rear elevation of the existing building comprising 14.5m2 d) All associated site works. | 2024-05-08 | APPLICATION DECLARED INVA |
| WEB1565/24 | 26, Station Road, Raheny, Dublin 5 | Planning permission is sought for widening an existing pedestrian access to create a vehicular access with ancillary site works | 2024-05-08 | Granted |
| WEB1568/24 | 29, Vernon Grove, Clontarf, Dublin 3, D03 W3P4 | The development consists of the construction of a dormer window to the rear roof plane of the property to create additional attic space for storage and a playroom, The removal of existing hot water solar panels and replacement with modern solar panels to the side of the proposed dormer window. Also a new bathroom window in the rear wall to replace the existing roof light window. Plus all associated works. | 2024-05-08 | APPLICATION DECLARED INVA |
| 3649/24 | Ballymun Civic Centre, Main Street, Ballymun, Dublin 9 | The development will consist of: Change of Use of existing Office areas on 1st & 2nd floors to Healthcare Facility use as part of reconfiguration & expansion of existing Healthcare Facility on Ground, 1st & 2nd floors of Ballymun Civic Centre, including internal alterations to enclose existing open plan office areas on 1st & 2nd floors (currently open to the internal atrium) with glazed screen enclosures, and minor alterations to the external façade on Main Street to incorporate ventilation grilles within the existing glazed curtain wall at first floor level. | 2024-05-08 | Granted |
| WEB1570/24 | 112, Sandford Road, Ranelagh, Dublin 6 | The demolition of the garage to the side and the single storey extension to the rear and the construction of a two storey extension to the rear and side including the widening of the existing vehicular access to 3.6metres together with an automatic timber faced gate 1.2M high and all ancillary works. | 2024-05-08 | Granted |
| 3652/24 | To the rear of No. 27 Howth Road, Clontarf West, Dublin 3, D03HY33 | The proposed development comprises the following: (i) demolition of existing structure comprising shed to the rear of No. 27 Howth Road; (ii) construction of a two-storey, three- bedroom mews dwelling with provision of stair over run and plant room projecting at roof level above parapet. The dwelling will be served by 1 no. car parking space, bicycle parking and bin storage in courtyard to front of proposed dwelling, and various areas of private open space in the form of a rear garden and roof terrace; (iii) vehicular access to the dwelling will be provided from Charlemont Lane; (iv) permission is also sought for all associated site and infrastructural works, inclusive of boundary treatments, landscaping and SuDS drainage, necessary to facilitate the development. | 2024-05-08 | Granted |
| 3651/24 | Queen of Peace Centre, Garville Place, Rathgar, Dublin 6 | For development at a site of c.0.4240 ha located at Queen of Peace Centre, Garville Place, Rathgar, Dublin 6, located on the western side of Garville Place to the rear of Garville Avenue nos. 6-8 and to the south of Garville Lane. The development is an amendment application to the permitted development under DCC Reg. Ref. 4071/22 (and previous permissions DCC Reg. Ref. 4613/19 & 2865/18). The amendments include the following: 1. Increase in the no. of bedrooms from 131 no. bedrooms to a proposed total of 133 no. bedrooms. 2. Replacement of permitted 5sqm entrance lobby with external canopy. 3. Additional 6.75sqm ground floor storage room. 4. Total of 14.5sqm additional floor area from ground to fourth floor. 5. Additional 8.5sqm sunroom area at fifth floor. 6. Minor alteration to permitted internal layouts. 7. Removal of permitted balconies and railings to permitted rear (north-west) elevation pursuant to the Fire Safety Certificate grant and conditions. 8. Amendments to permitted fenestration, materials and elevations, including the inclusion of render panels in lieu of some areas of aluminium panels. 9. Alterations to permitted fifth-floor internal configuration at stair core 02, including relocation of roof access door. 10. All associated and ancillary works. | 2024-05-08 | Granted |
| 3650/24 | 54, Marlborough Road, Dublin 4 | PROTECTED STRUCTURE. The development will consist of a new garden pavilion to the rear of the back garden (to provide ancillary residential accommodation for the main house), a new rendered boundary wall onto the lane with a pedestrian gate, maintenance and repair work to the south-west stone boundary wall and associated site works. | 2024-05-08 | Granted |
| WEB1566/24 | 38, Lennox Street, Dublin 8 | The development will consist of the erection of a retractable awning on the shopfront. | 2024-05-08 | APPLICATION DECLARED INVA |
| 3647/24 | 104 Church Road, East Wall, Dublin 3, D03E890 | For the Conversion of the existing attic space to habitation. Existing double apex roof to be replaced with a single apex roof with a dormer-style window to the rear and three No. Velux style roof lights to the front of the dwelling. Parapet to the front of dwelling to remain in place at the existing height. | 2024-05-07 | APPLICATION DECLARED INVA |
| WEB1561/24 | 47, Lombard Street West, Dublin 8 | The development will consist of: Extend and raise the roof height of the existing rear garage. With two velux windows. Raise the roof of the existing rear utility room. New side window. | 2024-05-07 | APPLICATION DECLARED INVA |
| WEB1556/24 | 47 Grange Park Crescent, Grange, Dublin 5 | PERMISSION New shed to the rear with garden room and gym area. | 2024-05-07 | Granted |
| WEB1557/24 | 2 Kensington Villas, Mountpleasant Avenue Upper, Rathmines, Dublin 6, D06 H3F2 | PERMISSION The development will consist of: Refurbishment and extension of the existing building, reverting the current arrangement of bedsits back to a single 3-bed family home. Works include thermal upgrades to the existing house, a new single-storey extension to the rear, a dormer roof window to the rear, and all associated site works. The building is within a conservation area and is not a protected structure. | 2024-05-07 | Granted |
| WEB1559/24 | 77, Grove Park, Rathmines, Dublin 6 | The development will consist of the demolition of an existing single-storey lean-to to the rear to facilitate a single-storey exempted development to the rear. | 2024-05-07 | Granted |
| WEB1558/24 | Adjacent to the National Oil Reserve Agency (NORA), Ringsend oil farm, Shellybanks Road, Dublin, Co. Dublin | PERMISSION The development will consist of a 220kV underground cable measuring approximately 4.0m in length, from the Ringsend Open Cycle Gas Turbine (OCGT) plant permitted under application ref: PWSDZ3074/23 and the existing Irishtown 220kV substation, to facilitate electricity generated to be transferred to the national grid, and includes all associated works to facilitate the development. | 2024-05-07 | Granted |